Serach
Send
Home SiteMap

Environmental System

案例研究

 

此案例應用於污水處理廠臭氣處理,共包括八套洗滌塔處理設備,總處理風量為306,000CMH,處理之廢氣包括NH3及H2S,處理效率達到95%以上,更提供雙段式洗滌塔設備。

Process: Odor Gas Control for Waste Water Treatment Plant
Odor abatement system: 8 sets scrubber, including 3 sets
  single packing bed scrubber and
  5 sets dual packing bed scrubber
Process exhaust flowrate: 36,000 m3/hr * 4 sets
  48,000 m3/hr * 3 sets
  18,000 m3/hr * 1 set
Odor component: NH3 / H2S
Process inlet temp.: 25 oC
Recirculation pump: four sets for dual packing bed
  two sets for single packing bed
  one opeation and one stand-by
  for each packing bed
DRE (Destruction Removal Efficiency): ≧ 95%