环保工程

案例研究

此案例应用于污水处理厂臭气处理,共包括八套洗涤塔处理设备,总处理风量为306,000CMH,处理之废气包括NH3及H2S,处理效率达到95%以上,更提供双段式洗涤塔设备。

Process: Odor Gas Control for Waste Water Treatment Plant
Odor abatement system: 8 sets scrubber, including 3 sets
  single packing bed scrubber and
  5 sets dual packing bed scrubber
Process exhaust flowrate: 36,000 m3/hr * 4 sets
  48,000 m3/hr * 3 sets
  18,000 m3/hr * 1 set
Odor component: NH3 / H2S
Process inlet temp.: 25 oC
Recirculation pump: four sets for dual packing bed
  two sets for single packing bed
  one opeation and one stand-by
  for each packing bed
DRE (Destruction Removal Efficiency): ≧ 95%